From 215d01e43e103f3fbb7e26b43607cd09f2856492 Mon Sep 17 00:00:00 2001 From: Cristian Cerroni Date: Fri, 13 Nov 2026 16:49:31 -0500 Subject: [PATCH] docs(01-07): track completed preparation and open acceptance gate --- .planning/ROADMAP.md | 14 +++++++++++--- .planning/STATE.md | 40 ++++++++++++++++++++++------------------ .planning/state.json | 6 +++--- 3 files changed, 36 insertions(+), 24 deletions(-) diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md index 74ba9ba..d94daf9 100644 --- a/.planning/ROADMAP.md +++ b/.planning/ROADMAP.md @@ -39,7 +39,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov 2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open. 3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition. 4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution. -**Plans:** 6/7 plans executed +**Plans:** 7/7 autonomous preparation/reconciliation plans recorded; actual 01-07-02 capture/review and Phase 1 acceptance remain pending. **Wave 1** - [x] 01-01-PLAN.md @@ -55,7 +55,15 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov - [x] 01-06-PLAN.md **Wave 5** *(blocked on Wave 4 completion)* -- [ ] 01-07-PLAN.md +- [x] 01-07-PLAN.md + + Autonomous preparation is complete: 11,000 immutable files pass readiness and + the complete local suite passes in 782.05s. Actual task 01-07-02 capture/review + remains human_needed: 0/120 original/native obligations accepted and ten human + findings pending. All EVID requirements remain Pending; Phase 1 is not accepted. + The primary reviews readiness before one combined session. Retained quota + handoff files are historical until primary consumption; the final SUMMARY + records completed task 3 and pending human dependencies. No Phase 2 advancement. ### Phase 2: Faithful Movement and Scene Handoffs **Goal:** Players move, contact the world and return from scripts/scenes with the original movement, animation, camera and state ownership intact. @@ -151,7 +159,7 @@ Execution follows 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8, subject to the ex | Phase | Plans Complete | Status | Completed | |-------|----------------|--------|-----------| -| 1. Reproducible Fidelity Baseline | 6/7 | In Progress | - | +| 1. Reproducible Fidelity Baseline | 7/7 preparation | Human acceptance pending (0/120) | - | | 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - | | 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - | | 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - | diff --git a/.planning/STATE.md b/.planning/STATE.md index d340af3..cb491f9 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -2,17 +2,17 @@ gsd_state_version: "1.0" current_phase: 01 current_phase_name: Reproducible Fidelity Baseline -status: executing -stopped_at: Paused by15% quota guard;01-07task3 test/review pending; HANDOFF takes precedence -last_updated: "2026-11-13T17:28:45.982275+00:00" -last_activity: 2026-11-12 -last_activity_desc: Phase 01 execution started -state_head: c60248dbfe5c8d151677babca0543af1f1d1b5e0 +status: ready_for_verification +stopped_at: Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120 +last_updated: "2026-11-13T21:48:54.245Z" +last_activity: 2026-11-13 +last_activity_desc: 01-07 autonomous preparation verified; actual human acceptance pending 0/120 +state_head: 52a3e2d5ff19a87e1bd268cdda8eb0ec6bf5e451 progress: total_phases: 8 completed_phases: 0 total_plans: 7 - completed_plans: 6 + completed_plans: 7 percent: 0 --- @@ -27,24 +27,24 @@ See: .planning/PROJECT.md (updated 2026-11-12) ## Current Position -Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING +Phase: 01 (Reproducible Fidelity Baseline) — HUMAN ACCEPTANCE PENDING Plan: 7 of 7 -Status: Interrupted —01-07 task1 complete; task2 human_needed; task3 fullsuite active -Last activity: 2026-11-12 — Phase 01 execution started +Status: Ready for primary review — 7/7 autonomous preparation records; actual 01-07-02 capture/review human_needed, 0/120 accepted. Phase 1 remains open; Phase 2 not advanced. +Last activity: 2026-11-13 — Task 3 committed, complete local suite passed in 782.05s; final summary committed. Progress: [░░░░░░░░░░] 0% ## Performance Metrics -- Total plans completed: 0 -- Average duration: Not established -- Total execution time: 0 hours +- Autonomous preparation plans recorded: 7/7; accepted phases: 0/8 +- Average duration: See per-plan metrics; elapsed intervals include pauses +- Total active execution time: Not continuously measured | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | - | - | - | - | -Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence. +Recent trend: All seven preparation/reconciliation records exist; actual task 01-07-02 and Phase 1/EVID acceptance remain open. Existing project work retains its documented bounded evidence. **Per-Plan Metrics:** | Plan | Duration | Tasks | Files | @@ -55,6 +55,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor | Phase 01 P04 | 16 min | 2 tasks | 5 files | | Phase 01 P05 | 12h 4min | 2 tasks | 7 files | | Phase 01 P06 | 14 min | 2 tasks | 4 files | +| Phase 01 P07 | 4h 36min elapsed incl quota pause; suite 782.05s | 2 tasks | 16 files | ## Accumulated Context @@ -78,13 +79,16 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor - [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables. - [Phase 01]: No display and only auto_null audio yields failed native preflight; all forty Linux obligations retain explicit physical/audible capture dependencies. - [Phase 01]: Linux matrix history revalidates saved receipt hashes and requires new launch/session IDs; focused captures cannot replace continuous route lifetimes. +- [Phase 01]: Ready materials and local regressions never substitute for actual original/native acceptance; all 120 obligations and ten named human findings remain open. +- [Phase 01]: The integration agent reconciles returned collector records through specified artifact mappings; the tester collects, observes and returns one combined session. ### Pending Todos -None captured separately. Next action: `$gsd-discuss-phase 1` or `$gsd-plan-phase 1`. +Primary readiness review of final 01-07 source/materials, then the single combined human session in docs/evidence/checkpoint-session.md. All EVID requirements remain Pending. Do not launch Phase 2 from preparation counts. ### Blockers/Concerns +- Final 01-07 readiness passes 11,000 immutable files and local suite passes; strict audit still exits 1 with no structural errors, 0/120 accepted obligations and ten pending human findings. This is an actual evidence dependency, not a test failure or auto-approval gate. - Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues. - Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes. - Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes. @@ -104,6 +108,6 @@ No original-required category deferred outside full reconstruction. Later phases ## Session Continuity -Last session: 2026-11-13T17:04:40.619Z -Stopped at: Paused by15% quota guard;01-07task3 test/review pending -Resume file: .planning/phases/01-reproducible-fidelity-baseline/HANDOFF.md +Last session: 2026-11-13T21:48:54.215Z +Stopped at: Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120 +Resume file: None diff --git a/.planning/state.json b/.planning/state.json index 14ffae7..834bbb9 100644 --- a/.planning/state.json +++ b/.planning/state.json @@ -46,8 +46,8 @@ ], "next": { "command": "$gsd-progress --next", - "label": "Advance to the next step", - "reason": "Phase 1 of 8 · 0% · executing" + "label": "Review prepared Phase 1 checkpoint and pending combined human session", + "reason": "Phase 1 remains open: 7/7 autonomous preparation records, actual acceptance human_needed 0/120; Phase 2 not advanced" }, - "updated_at": "2026-11-13T17:04:38.735Z" + "updated_at": "2026-11-13T21:49:00Z" }