From 4bf072d03cda980abd58a84a1c6bfe286d4417cc Mon Sep 17 00:00:00 2001 From: Cristian Cerroni Date: Thu, 12 Nov 2026 23:23:27 -0500 Subject: [PATCH] docs(01-04): advance sequential observation plan metadata --- .planning/ROADMAP.md | 6 +++--- .planning/STATE.md | 18 +++++++++++------- .planning/state.json | 2 +- 3 files changed, 15 insertions(+), 11 deletions(-) diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md index fbdc32b..acf9cbe 100644 --- a/.planning/ROADMAP.md +++ b/.planning/ROADMAP.md @@ -39,14 +39,14 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov 2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open. 3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition. 4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution. -**Plans:** 3/7 plans executed +**Plans:** 4/7 plans executed **Wave 1** - [x] 01-01-PLAN.md **Wave 2** *(blocked on Wave 1 completion)* - [x] 01-02-PLAN.md - [x] 01-03-PLAN.md -- [ ] 01-04-PLAN.md +- [x] 01-04-PLAN.md **Wave 3** *(blocked on Wave 2 completion)* - [ ] 01-05-PLAN.md @@ -151,7 +151,7 @@ Execution follows 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8, subject to the ex | Phase | Plans Complete | Status | Completed | |-------|----------------|--------|-----------| -| 1. Reproducible Fidelity Baseline | 3/7 | In Progress | - | +| 1. Reproducible Fidelity Baseline | 4/7 | In Progress | - | | 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - | | 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - | | 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - | diff --git a/.planning/STATE.md b/.planning/STATE.md index 4b12c9d..8beed1f 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -3,16 +3,16 @@ gsd_state_version: "1.0" current_phase: 01 current_phase_name: Reproducible Fidelity Baseline status: executing -stopped_at: Completed 01-03-PLAN.md; primary continues phase1 -last_updated: "2026-11-13T03:59:45.965Z" +stopped_at: Completed 01-04-PLAN.md; primary continues phase1 +last_updated: "2026-11-13T04:23:09.969Z" last_activity: 2026-11-12 last_activity_desc: Phase 01 execution started -state_head: 564b19ad03e39b34fa31b35db07a121ac023070d +state_head: 85e533b6293e8573abe41738e467c79c721b012a progress: total_phases: 8 completed_phases: 0 total_plans: 7 - completed_plans: 3 + completed_plans: 4 percent: 0 --- @@ -28,7 +28,7 @@ See: .planning/PROJECT.md (updated 2026-11-12) ## Current Position Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING -Plan: 4 of 7 +Plan: 5 of 7 Status: Ready to execute Last activity: 2026-11-12 — Phase 01 execution started @@ -52,6 +52,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor | Phase 01 P01 | 16 min | 2 tasks | 5 files | | Phase 01 P02 | 16 min | 2 tasks | 6 files | | Phase 01 P03 | 22 min | 2 tasks | 4 files | +| Phase 01 P04 | 16 min | 2 tasks | 5 files | ## Accumulated Context @@ -68,6 +69,9 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor - [Phase 01]: Paired review preserves actual speed, separate raw clocks, explicit event and playback drift, exclusive audio and complete recording tails; export never promotes runtime acceptance. - [Phase 01]: Capability source links are normalized to contained tracked bounded UTF-8 text copies and activated only through exporter-validated local hrefs. - [Phase 01]: Capability ledger maps all33 requirements and reconciles33 hashed checkpoint rows; documentary coverage, unimplemented work and exact historical content never promote actual original/native acceptance. +- [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance. +- [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred. +- [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations. ### Pending Todos @@ -94,6 +98,6 @@ No original-required category deferred outside full reconstruction. Later phases ## Session Continuity -Last session: 2026-11-13T03:59:45.938Z -Stopped at: Completed 01-03-PLAN.md; primary continues phase1 +Last session: 2026-11-13T04:23:09.938Z +Stopped at: Completed 01-04-PLAN.md; primary continues phase1 Resume file: None diff --git a/.planning/state.json b/.planning/state.json index 8598064..f9d7550 100644 --- a/.planning/state.json +++ b/.planning/state.json @@ -49,5 +49,5 @@ "label": "Advance to the next step", "reason": "Phase 1 of 8 · 0% · executing" }, - "updated_at": "2026-11-13T03:59:45.311Z" + "updated_at": "2026-11-13T04:23:08.932Z" }