From 589481218d4d34f236efbf4ca7b91ab3d640d075 Mon Sep 17 00:00:00 2001 From: Cristian Cerroni Date: Fri, 13 Nov 2026 12:05:23 -0500 Subject: [PATCH] docs(01-06): advance completed capture plan tracking --- .planning/ROADMAP.md | 6 +++--- .planning/STATE.md | 17 ++++++++++------- 2 files changed, 13 insertions(+), 10 deletions(-) diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md index a4bdf9e..74ba9ba 100644 --- a/.planning/ROADMAP.md +++ b/.planning/ROADMAP.md @@ -39,7 +39,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov 2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open. 3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition. 4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution. -**Plans:** 5/7 plans executed +**Plans:** 6/7 plans executed **Wave 1** - [x] 01-01-PLAN.md @@ -52,7 +52,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov - [x] 01-05-PLAN.md **Wave 4** *(blocked on Wave 3 completion)* -- [ ] 01-06-PLAN.md +- [x] 01-06-PLAN.md **Wave 5** *(blocked on Wave 4 completion)* - [ ] 01-07-PLAN.md @@ -151,7 +151,7 @@ Execution follows 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8, subject to the ex | Phase | Plans Complete | Status | Completed | |-------|----------------|--------|-----------| -| 1. Reproducible Fidelity Baseline | 5/7 | In Progress | - | +| 1. Reproducible Fidelity Baseline | 6/7 | In Progress | - | | 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - | | 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - | | 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - | diff --git a/.planning/STATE.md b/.planning/STATE.md index eac2b5f..540a6a2 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -3,16 +3,16 @@ gsd_state_version: "1.0" current_phase: 01 current_phase_name: Reproducible Fidelity Baseline status: executing -stopped_at: Completed 01-05-PLAN.md -last_updated: "2026-11-13T16:45:57.021Z" +stopped_at: Completed 01-06-PLAN.md +last_updated: "2026-11-13T17:04:40.651Z" last_activity: 2026-11-12 last_activity_desc: Phase 01 execution started -state_head: 2d48ee5316a727e510db54910c59bc0a79e18e6f +state_head: c60248dbfe5c8d151677babca0543af1f1d1b5e0 progress: total_phases: 8 completed_phases: 0 total_plans: 7 - completed_plans: 5 + completed_plans: 6 percent: 0 --- @@ -28,7 +28,7 @@ See: .planning/PROJECT.md (updated 2026-11-12) ## Current Position Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING -Plan: 6 of 7 +Plan: 7 of 7 Status: Ready to execute Last activity: 2026-11-12 — Phase 01 execution started @@ -54,6 +54,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor | Phase 01 P03 | 22 min | 2 tasks | 4 files | | Phase 01 P04 | 16 min | 2 tasks | 5 files | | Phase 01 P05 | 12h 4min | 2 tasks | 7 files | +| Phase 01 P06 | 14 min | 2 tasks | 4 files | ## Accumulated Context @@ -75,6 +76,8 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor - [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations. - [Phase 01]: READY validates identified offline materials only; original-DxWnd/native Linux/native Windows acceptance remains open 0/120. - [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables. +- [Phase 01]: No display and only auto_null audio yields failed native preflight; all forty Linux obligations retain explicit physical/audible capture dependencies. +- [Phase 01]: Linux matrix history revalidates saved receipt hashes and requires new launch/session IDs; focused captures cannot replace continuous route lifetimes. ### Pending Todos @@ -101,6 +104,6 @@ No original-required category deferred outside full reconstruction. Later phases ## Session Continuity -Last session: 2026-11-13T16:45:56.992Z -Stopped at: Completed 01-05-PLAN.md +Last session: 2026-11-13T17:04:40.619Z +Stopped at: Completed 01-06-PLAN.md Resume file: None