# Compatibility and validation
## Planned Phase 1 capture setup — 2026-11-12
The user has a local Windows PC for combined reference/port checkpoint sessions.
Original-game reference execution is planned through DxWnd on a generated copy;
record Windows, DxWnd version/settings and capture limitations. Native Windows
port results remain distinct. This is setup availability and a discussion decision,
not a new launch, capture, original-comparison or native Windows verification
receipt. Existing verification claims and open acceptance dependencies remain.
2026-11-07 normal-callback checkpoint:30 complete emitted original/C# fixture
snapshots match exact float32 values, raw angle arguments/results and getter
order. The inherited ceiling/reflection/angular component remains outside live
+12
View File
@@ -1,5 +1,17 @@
# Decisions
## Phase 1 comparison decisions — 2026-11-12
Use full lab → VR04 → lab → outside journeys plus focused normal/edge-input
replays, with equal natural/skipped dialogue and separate fresh/retained coverage.
Review original/port playback together with optional overlays, actual timing drift
and switchable audio. Browse evidence by capability with current gaps first and
expandable revision history; order discrepancies by player impact. Prepare one
local bundle and combined Windows session per checkpoint. The original runs from
a generated copy through DxWnd, with version/settings recorded; port-native
receipts remain separate. Full decisions are in
`../.planning/phases/01-reproducible-fidelity-baseline/01-CONTEXT.md`.
## Full reconstruction planning — 2026-11-12
The user scoped GSD planning to the remaining full reconstruction and explicitly
+9
View File
@@ -1,5 +1,14 @@
# Progress — 2026-11-07
## Phase 1 discussion complete — 2026-11-12
Phase 1 context and the discussion audit are captured in
`../.planning/phases/01-reproducible-fidelity-baseline/`. Decisions cover full-route
and focused comparisons, paired playback, a capability-led evidence ledger and
combined local Windows sessions. The original will run through DxWnd on the
user’s Windows PC; record wrapper configuration separately from port receipts.
Next: `$gsd-plan-phase 1`. No new runtime or platform verification is established.
## Planning initialization — 2026-11-12
GSD onboarding and full-reconstruction planning are initialized in
+3 -1
View File
@@ -4,7 +4,9 @@
- [x] Initialize full remaining reconstruction scope, research,33 requirements
and8 playable-slice phases in `../.planning/`.
- [ ] Discuss/plan phase1: Reproducible Fidelity Baseline. Keep original/native
- [x] Discuss phase1: Reproducible Fidelity Baseline; capture all four areas and
the Windows/DxWnd setup in `../.planning/phases/01-reproducible-fidelity-baseline/01-CONTEXT.md`.
- [ ] Plan phase1 (`$gsd-plan-phase 1`). Keep original/native
Windows access dependencies open; independent source-backed recovery may
continue under the explicit roadmap exception.
- [ ] Execute the roadmap with current evidence/admission gates; initialization