diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md index ee3ad26..fbdc32b 100644 --- a/.planning/ROADMAP.md +++ b/.planning/ROADMAP.md @@ -39,13 +39,13 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov 2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open. 3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition. 4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution. -**Plans:** 2/7 plans executed +**Plans:** 3/7 plans executed **Wave 1** - [x] 01-01-PLAN.md **Wave 2** *(blocked on Wave 1 completion)* - [x] 01-02-PLAN.md -- [ ] 01-03-PLAN.md +- [x] 01-03-PLAN.md - [ ] 01-04-PLAN.md **Wave 3** *(blocked on Wave 2 completion)* @@ -151,7 +151,7 @@ Execution follows 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8, subject to the ex | Phase | Plans Complete | Status | Completed | |-------|----------------|--------|-----------| -| 1. Reproducible Fidelity Baseline | 2/7 | In Progress | - | +| 1. Reproducible Fidelity Baseline | 3/7 | In Progress | - | | 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - | | 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - | | 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - | diff --git a/.planning/STATE.md b/.planning/STATE.md index 15df541..4b12c9d 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -2,17 +2,17 @@ gsd_state_version: "1.0" current_phase: 01 current_phase_name: Reproducible Fidelity Baseline -status: paused -stopped_at: "User usage pause;01-03 task2 partial; resume after10:28 PM reset" -last_updated: "2026-11-13T01:02:27.885Z" +status: executing +stopped_at: Completed 01-03-PLAN.md; primary continues phase1 +last_updated: "2026-11-13T03:59:45.965Z" last_activity: 2026-11-12 last_activity_desc: Phase 01 execution started -state_head: c21ed7d7a2cfd3f0e440e153e217a09a76e0b4cb +state_head: 564b19ad03e39b34fa31b35db07a121ac023070d progress: total_phases: 8 completed_phases: 0 total_plans: 7 - completed_plans: 2 + completed_plans: 3 percent: 0 --- @@ -28,8 +28,8 @@ See: .planning/PROJECT.md (updated 2026-11-12) ## Current Position Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING -Plan: 3 of 7 -Status: Paused +Plan: 4 of 7 +Status: Ready to execute Last activity: 2026-11-12 — Phase 01 execution started Progress: [░░░░░░░░░░] 0% @@ -51,6 +51,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor |------|----------|-------|-------| | Phase 01 P01 | 16 min | 2 tasks | 5 files | | Phase 01 P02 | 16 min | 2 tasks | 6 files | +| Phase 01 P03 | 22 min | 2 tasks | 4 files | ## Accumulated Context @@ -66,6 +67,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor - [Phase 01]: Retained observations require one session, observed prerequisite departure/return and hashed copy state; each fresh run uses an independent launch/session identity. - [Phase 01]: Paired review preserves actual speed, separate raw clocks, explicit event and playback drift, exclusive audio and complete recording tails; export never promotes runtime acceptance. - [Phase 01]: Capability source links are normalized to contained tracked bounded UTF-8 text copies and activated only through exporter-validated local hrefs. +- [Phase 01]: Capability ledger maps all33 requirements and reconciles33 hashed checkpoint rows; documentary coverage, unimplemented work and exact historical content never promote actual original/native acceptance. ### Pending Todos @@ -92,6 +94,6 @@ No original-required category deferred outside full reconstruction. Later phases ## Session Continuity -Last session: 2026-11-13T01:02:27.859Z -Stopped at: User usage pause;01-03 task2 partial; resume after10:28 PM reset -Resume file: .planning/phases/01-reproducible-fidelity-baseline/.continue-here.md +Last session: 2026-11-13T03:59:45.938Z +Stopped at: Completed 01-03-PLAN.md; primary continues phase1 +Resume file: None diff --git a/.planning/state.json b/.planning/state.json index 1a19ef6..8598064 100644 --- a/.planning/state.json +++ b/.planning/state.json @@ -49,5 +49,5 @@ "label": "Advance to the next step", "reason": "Phase 1 of 8 · 0% · executing" }, - "updated_at": "2026-11-13T00:48:46.685Z" + "updated_at": "2026-11-13T03:59:45.311Z" }