--- gsd_state_version: "1.0" current_phase: 01 current_phase_name: Reproducible Fidelity Baseline status: executing stopped_at: Completed 01-04-PLAN.md; primary continues phase1 last_updated: "2026-11-13T04:23:09.969Z" last_activity: 2026-11-12 last_activity_desc: Phase 01 execution started state_head: 85e533b6293e8573abe41738e467c79c721b012a progress: total_phases: 8 completed_phases: 0 total_plans: 7 completed_plans: 4 percent: 0 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-11-12) **Core value:** Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification. **Current focus:** Phase 01 — Reproducible Fidelity Baseline ## Current Position Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING Plan: 5 of 7 Status: Ready to execute Last activity: 2026-11-12 — Phase 01 execution started Progress: [░░░░░░░░░░] 0% ## Performance Metrics - Total plans completed: 0 - Average duration: Not established - Total execution time: 0 hours | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | - | - | - | - | Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence. **Per-Plan Metrics:** | Plan | Duration | Tasks | Files | |------|----------|-------|-------| | Phase 01 P01 | 16 min | 2 tasks | 5 files | | Phase 01 P02 | 16 min | 2 tasks | 6 files | | Phase 01 P03 | 22 min | 2 tasks | 4 files | | Phase 01 P04 | 16 min | 2 tasks | 5 files | ## Accumulated Context ### Decisions - Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks. - Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session. - Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion. - Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release. - Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes. - [Phase 01]: Version 1 typed hashed receipts keep category, history and actual bytes separate from acceptance; structural readiness never substitutes for native/reference execution. - [Phase 01]: All eight lifetime/dialogue/input cells require continuous plus four focused obligations on three original/native sides, totaling 120 independently audited obligations. - [Phase 01]: Retained observations require one session, observed prerequisite departure/return and hashed copy state; each fresh run uses an independent launch/session identity. - [Phase 01]: Paired review preserves actual speed, separate raw clocks, explicit event and playback drift, exclusive audio and complete recording tails; export never promotes runtime acceptance. - [Phase 01]: Capability source links are normalized to contained tracked bounded UTF-8 text copies and activated only through exporter-validated local hrefs. - [Phase 01]: Capability ledger maps all33 requirements and reconciles33 hashed checkpoint rows; documentary coverage, unimplemented work and exact historical content never promote actual original/native acceptance. - [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance. - [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred. - [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations. ### Pending Todos None captured separately. Next action: `$gsd-discuss-phase 1` or `$gsd-plan-phase 1`. ### Blockers/Concerns - Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues. - Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes. - Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes. - Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect. ### Evidence Pointers - `.planning/research/SUMMARY.md`, `.planning/codebase/` — scope, dependencies and current architecture. - `docs/progress.md`, `docs/compatibility.md`, `docs/tasks.md` — implementation/runtime receipts and open work. - `docs/checkpoint/next-work-plan.md`, `coverage.md`, `implementation-plan.md` — recovery/admission sequence (latter two under the same directory). - `docs/gameplay/main-menu-player-lifetime.md`, `jimmy-movement-stabilization.md` — preserved correction and movement priority (same directory). - `../prompt.MD`, `AGENTS.md`, `../AGENTS.md` — authoritative specification/rules; original manifest at `docs/original-manifest.json`. ## Deferred Items No original-required category deferred outside full reconstruction. Later phases express dependency order only. ## Session Continuity Last session: 2026-11-13T04:23:09.938Z Stopped at: Completed 01-04-PLAN.md; primary continues phase1 Resume file: None