--- gsd_state_version: "1.0" current_phase: 01 current_phase_name: Reproducible Fidelity Baseline status: ready_for_verification stopped_at: Phase1 autonomous preparation reviewed; final verification and human acceptance pending last_updated: "2026-11-13T22:22:35.261Z" last_activity: 2026-11-13 last_activity_desc: 01-07 autonomous preparation verified; actual human acceptance pending 0/120 state_head: 02d182f35de643f9d68699b2fff1d219dd132edb progress: total_phases: 8 completed_phases: 0 total_plans: 7 completed_plans: 7 percent: 0 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-11-12) **Core value:** Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification. **Current focus:** Phase 01 — Reproducible Fidelity Baseline ## Current Position Phase: 01 (Reproducible Fidelity Baseline) — HUMAN ACCEPTANCE PENDING Plan: 7 of 7 Status: Preparation complete; actual original/native acceptance human_needed Last activity: 2026-11-13 — Task 3 committed, complete local suite passed in 782.05s; final summary committed. Progress: [░░░░░░░░░░] 0% ## Performance Metrics - Autonomous preparation plans recorded: 7/7; accepted phases: 0/8 - Average duration: See per-plan metrics; elapsed intervals include pauses - Total active execution time: Not continuously measured | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | - | - | - | - | Recent trend: All seven preparation/reconciliation records exist; actual task 01-07-02 and Phase 1/EVID acceptance remain open. Existing project work retains its documented bounded evidence. **Per-Plan Metrics:** | Plan | Duration | Tasks | Files | |------|----------|-------|-------| | Phase 01 P01 | 16 min | 2 tasks | 5 files | | Phase 01 P02 | 16 min | 2 tasks | 6 files | | Phase 01 P03 | 22 min | 2 tasks | 4 files | | Phase 01 P04 | 16 min | 2 tasks | 5 files | | Phase 01 P05 | 12h 4min | 2 tasks | 7 files | | Phase 01 P06 | 14 min | 2 tasks | 4 files | | Phase 01 P07 | 4h 36min elapsed incl quota pause; suite 782.05s | 2 tasks | 16 files | ## Accumulated Context ### Decisions - Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks. - Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session. - Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion. - Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release. - Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes. - [Phase 01]: Version 1 typed hashed receipts keep category, history and actual bytes separate from acceptance; structural readiness never substitutes for native/reference execution. - [Phase 01]: All eight lifetime/dialogue/input cells require continuous plus four focused obligations on three original/native sides, totaling 120 independently audited obligations. - [Phase 01]: Retained observations require one session, observed prerequisite departure/return and hashed copy state; each fresh run uses an independent launch/session identity. - [Phase 01]: Paired review preserves actual speed, separate raw clocks, explicit event and playback drift, exclusive audio and complete recording tails; export never promotes runtime acceptance. - [Phase 01]: Capability source links are normalized to contained tracked bounded UTF-8 text copies and activated only through exporter-validated local hrefs. - [Phase 01]: Capability ledger maps all33 requirements and reconciles33 hashed checkpoint rows; documentary coverage, unimplemented work and exact historical content never promote actual original/native acceptance. - [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance. - [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred. - [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations. - [Phase 01]: READY validates identified offline materials only; original-DxWnd/native Linux/native Windows acceptance remains open 0/120. - [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables. - [Phase 01]: No display and only auto_null audio yields failed native preflight; all forty Linux obligations retain explicit physical/audible capture dependencies. - [Phase 01]: Linux matrix history revalidates saved receipt hashes and requires new launch/session IDs; focused captures cannot replace continuous route lifetimes. - [Phase 01]: Ready materials and local regressions never substitute for actual original/native acceptance; all 120 obligations and ten named human findings remain open. - [Phase 01]: The integration agent reconciles returned collector records through specified artifact mappings; the tester collects, observes and returns one combined session. ### Pending Todos Primary readiness review of final 01-07 source/materials, then the single combined human session in docs/evidence/checkpoint-session.md. All EVID requirements remain Pending. Do not launch Phase 2 from preparation counts. ### Blockers/Concerns - Final 01-07 readiness passes 11,000 immutable files and local suite passes; strict audit still exits 1 with no structural errors, 0/120 accepted obligations and ten pending human findings. This is an actual evidence dependency, not a test failure or auto-approval gate. - Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues. - Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes. - Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes. - Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect. ### Evidence Pointers - `.planning/research/SUMMARY.md`, `.planning/codebase/` — scope, dependencies and current architecture. - `docs/progress.md`, `docs/compatibility.md`, `docs/tasks.md` — implementation/runtime receipts and open work. - `docs/checkpoint/next-work-plan.md`, `coverage.md`, `implementation-plan.md` — recovery/admission sequence (latter two under the same directory). - `docs/gameplay/main-menu-player-lifetime.md`, `jimmy-movement-stabilization.md` — preserved correction and movement priority (same directory). - `../prompt.MD`, `AGENTS.md`, `../AGENTS.md` — authoritative specification/rules; original manifest at `docs/original-manifest.json`. ## Deferred Items No original-required category deferred outside full reconstruction. Later phases express dependency order only. ## Session Continuity Last session: 2026-11-13T22:22:35.231Z Stopped at: Phase1 autonomous preparation reviewed; final verification and human acceptance pending Resume file: docs/evidence/checkpoint-session.md