Phase 01 — Plan Verification Receipt
Date: 2026-11-12 Result: VERIFICATION PASSED after one revision cycle; zero remaining blockers/warnings.
Independent initial checker reviewed seven plans, 15 tasks and five waves. All four requirements and 16 context decisions are covered; dependencies are acyclic and same-wave file ownership is disjoint. Deterministic verify-command path and stated failure-direction probes each examined 24 commands with zero findings. New paths are declared future artifacts, not implementation already present.
Findings resolved
- Research resolution blocker: five research questions now carry concrete RESOLVED planning policies and task references. Unknown Windows/DxWnd/capture/browser outcomes remain explicit execution acceptance dependencies.
- Scope warning for plan 01-07: a scope_budget block bounds ten files to two substantive implementation/test files and serial final evidence/report/runner projections. The 30,000-token estimate is below the 100,000-token plan budget; confidence remains low because this roadmap has no calibration samples.
A separate independent checker rechecked both changes and returned VERIFICATION PASSED with zero blockers/warnings. No requirement or human acceptance was waived.
Final deterministic gates
- Requirement coverage: EVID-01 through EVID-04, 4/4.
- Context decision coverage: D-01 through D-16, 16/16.
- Post-planning gap analysis: 20/20 combined items; zero uncovered.
- Seven plan structure/frontmatter validations passed during planning.
- Original inventory: 539 unchanged files verified by the prescribed command.
Planning and original inventory checks only: new implementation/test fixtures, original/DxWnd captures and native Linux/Windows acceptance were not executed. They remain in the execution plans; prepared materials cannot establish parity.