| 1.0 | 01 | Reproducible Fidelity Baseline | ready_for_verification | Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120 | 2026-11-13T21:48:54.245Z | 2026-11-13 | 01-07 autonomous preparation verified; actual human acceptance pending 0/120 | 52a3e2d5ff |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-11-12)
Core value: Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification. Current focus: Phase 01 — Reproducible Fidelity Baseline
Current Position
Phase: 01 (Reproducible Fidelity Baseline) — HUMAN ACCEPTANCE PENDING Plan: 7 of 7 Status: Ready for primary review — 7/7 autonomous preparation records; actual 01-07-02 capture/review human_needed, 0/120 accepted. Phase 1 remains open; Phase 2 not advanced. Last activity: 2026-11-13 — Task 3 committed, complete local suite passed in 782.05s; final summary committed.
Progress: [░░░░░░░░░░] 0%
Performance Metrics
- Autonomous preparation plans recorded: 7/7; accepted phases: 0/8
- Average duration: See per-plan metrics; elapsed intervals include pauses
- Total active execution time: Not continuously measured
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| - | - | - | - |
Recent trend: All seven preparation/reconciliation records exist; actual task 01-07-02 and Phase 1/EVID acceptance remain open. Existing project work retains its documented bounded evidence. Per-Plan Metrics:
| Plan | Duration | Tasks | Files |
|---|---|---|---|
| Phase 01 P01 | 16 min | 2 tasks | 5 files |
| Phase 01 P02 | 16 min | 2 tasks | 6 files |
| Phase 01 P03 | 22 min | 2 tasks | 4 files |
| Phase 01 P04 | 16 min | 2 tasks | 5 files |
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
| Phase 01 P06 | 14 min | 2 tasks | 4 files |
| Phase 01 P07 | 4h 36min elapsed incl quota pause; suite 782.05s | 2 tasks | 16 files |
Accumulated Context
Decisions
- Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks.
- Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session.
- Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion.
- Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release.
- Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes.
- [Phase 01]: Version 1 typed hashed receipts keep category, history and actual bytes separate from acceptance; structural readiness never substitutes for native/reference execution.
- [Phase 01]: All eight lifetime/dialogue/input cells require continuous plus four focused obligations on three original/native sides, totaling 120 independently audited obligations.
- [Phase 01]: Retained observations require one session, observed prerequisite departure/return and hashed copy state; each fresh run uses an independent launch/session identity.
- [Phase 01]: Paired review preserves actual speed, separate raw clocks, explicit event and playback drift, exclusive audio and complete recording tails; export never promotes runtime acceptance.
- [Phase 01]: Capability source links are normalized to contained tracked bounded UTF-8 text copies and activated only through exporter-validated local hrefs.
- [Phase 01]: Capability ledger maps all33 requirements and reconciles33 hashed checkpoint rows; documentary coverage, unimplemented work and exact historical content never promote actual original/native acceptance.
- [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance.
- [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred.
- [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations.
- [Phase 01]: READY validates identified offline materials only; original-DxWnd/native Linux/native Windows acceptance remains open 0/120.
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
- [Phase 01]: No display and only auto_null audio yields failed native preflight; all forty Linux obligations retain explicit physical/audible capture dependencies.
- [Phase 01]: Linux matrix history revalidates saved receipt hashes and requires new launch/session IDs; focused captures cannot replace continuous route lifetimes.
- [Phase 01]: Ready materials and local regressions never substitute for actual original/native acceptance; all 120 obligations and ten named human findings remain open.
- [Phase 01]: The integration agent reconciles returned collector records through specified artifact mappings; the tester collects, observes and returns one combined session.
Pending Todos
Primary readiness review of final 01-07 source/materials, then the single combined human session in docs/evidence/checkpoint-session.md. All EVID requirements remain Pending. Do not launch Phase 2 from preparation counts.
Blockers/Concerns
- Final 01-07 readiness passes 11,000 immutable files and local suite passes; strict audit still exits 1 with no structural errors, 0/120 accepted obligations and ten pending human findings. This is an actual evidence dependency, not a test failure or auto-approval gate.
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
- Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect.
Evidence Pointers
.planning/research/SUMMARY.md,.planning/codebase/— scope, dependencies and current architecture.docs/progress.md,docs/compatibility.md,docs/tasks.md— implementation/runtime receipts and open work.docs/checkpoint/next-work-plan.md,coverage.md,implementation-plan.md— recovery/admission sequence (latter two under the same directory).docs/gameplay/main-menu-player-lifetime.md,jimmy-movement-stabilization.md— preserved correction and movement priority (same directory).../prompt.MD,AGENTS.md,../AGENTS.md— authoritative specification/rules; original manifest atdocs/original-manifest.json.
Deferred Items
No original-required category deferred outside full reconstruction. Later phases express dependency order only.
Session Continuity
Last session: 2026-11-13T21:48:54.215Z Stopped at: Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120 Resume file: None