4.1 KiB
gsd_state_version, current_phase, current_phase_name, status, stopped_at, last_updated, last_activity, last_activity_desc, state_head, progress
| gsd_state_version | current_phase | current_phase_name | status | stopped_at | last_updated | last_activity | last_activity_desc | state_head | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | 1 | Reproducible Fidelity Baseline | executing | Phase 1 planned and verified; next: gsd-execute-phase 1 | 2026-11-12T22:38:11.076Z | 2026-11-12 | Phase 1 research and seven plans verified; ready to execute | 36f24e4474 |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-11-12)
Core value: Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification. Current focus: Phase 1 — Reproducible Fidelity Baseline.
Current Position
Phase: 1 (Reproducible Fidelity Baseline) — READY TO EXECUTE Plan: 0 of 7 executed; next plan 01-01 Status: Ready to execute Last activity: 2026-11-12 — Phase 1 research and seven plans verified; ready to execute
Progress: [░░░░░░░░░░] 0%
Performance Metrics
- Total plans completed: 0
- Average duration: Not established
- Total execution time: 0 hours
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| - | - | - | - |
Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence.
Accumulated Context
Decisions
- Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks.
- Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session.
- Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion.
- Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release.
- Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes.
Pending Todos
None captured separately. Next action: $gsd-discuss-phase 1 or $gsd-plan-phase 1.
Blockers/Concerns
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
- Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect.
Evidence Pointers
.planning/research/SUMMARY.md,.planning/codebase/— scope, dependencies and current architecture.docs/progress.md,docs/compatibility.md,docs/tasks.md— implementation/runtime receipts and open work.docs/checkpoint/next-work-plan.md,coverage.md,implementation-plan.md— recovery/admission sequence (latter two under the same directory).docs/gameplay/main-menu-player-lifetime.md,jimmy-movement-stabilization.md— preserved correction and movement priority (same directory).../prompt.MD,AGENTS.md,../AGENTS.md— authoritative specification/rules; original manifest atdocs/original-manifest.json.
Deferred Items
No original-required category deferred outside full reconstruction. Later phases express dependency order only.
Session Continuity
Last session: 2026-11-12T22:37:42.727Z Stopped at: Phase 1 planned and verified; next: gsd-execute-phase 1 Resume file: .planning/phases/01-reproducible-fidelity-baseline/01-01-PLAN.md