@@ -39,7 +39,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov
|
||||
2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open.
|
||||
3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition.
|
||||
4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution.
|
||||
**Plans:** 4/7 plans executed
|
||||
**Plans:** 5/7 plans executed
|
||||
**Wave 1**
|
||||
- [x] 01-01-PLAN.md
|
||||
|
||||
@@ -49,7 +49,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov
|
||||
- [x] 01-04-PLAN.md
|
||||
|
||||
**Wave 3** *(blocked on Wave 2 completion)*
|
||||
- [ ] 01-05-PLAN.md
|
||||
- [x] 01-05-PLAN.md
|
||||
|
||||
**Wave 4** *(blocked on Wave 3 completion)*
|
||||
- [ ] 01-06-PLAN.md
|
||||
@@ -151,7 +151,7 @@ Execution follows 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8, subject to the ex
|
||||
|
||||
| Phase | Plans Complete | Status | Completed |
|
||||
|-------|----------------|--------|-----------|
|
||||
| 1. Reproducible Fidelity Baseline | 4/7 | In Progress | - |
|
||||
| 1. Reproducible Fidelity Baseline | 5/7 | In Progress | - |
|
||||
| 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - |
|
||||
| 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - |
|
||||
| 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - |
|
||||
|
||||
+11
-8
@@ -3,16 +3,16 @@ gsd_state_version: "1.0"
|
||||
current_phase: 01
|
||||
current_phase_name: Reproducible Fidelity Baseline
|
||||
status: executing
|
||||
stopped_at: Quota interrupted01-05 task2; reconcile partialsource beforecontinuing
|
||||
last_updated: "2026-11-13T16:07:38.336Z"
|
||||
stopped_at: Completed 01-05-PLAN.md
|
||||
last_updated: "2026-11-13T16:45:57.021Z"
|
||||
last_activity: 2026-11-12
|
||||
last_activity_desc: Phase 01 execution started
|
||||
state_head: 818191c90c997618df2c31d5ba90b5fc21328d76
|
||||
state_head: 2d48ee5316a727e510db54910c59bc0a79e18e6f
|
||||
progress:
|
||||
total_phases: 8
|
||||
completed_phases: 0
|
||||
total_plans: 7
|
||||
completed_plans: 4
|
||||
completed_plans: 5
|
||||
percent: 0
|
||||
---
|
||||
|
||||
@@ -28,7 +28,7 @@ See: .planning/PROJECT.md (updated 2026-11-12)
|
||||
## Current Position
|
||||
|
||||
Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING
|
||||
Plan: 5 of 7
|
||||
Plan: 6 of 7
|
||||
Status: Ready to execute
|
||||
Last activity: 2026-11-12 — Phase 01 execution started
|
||||
|
||||
@@ -53,6 +53,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
||||
| Phase 01 P02 | 16 min | 2 tasks | 6 files |
|
||||
| Phase 01 P03 | 22 min | 2 tasks | 4 files |
|
||||
| Phase 01 P04 | 16 min | 2 tasks | 5 files |
|
||||
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -72,6 +73,8 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
||||
- [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance.
|
||||
- [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred.
|
||||
- [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations.
|
||||
- [Phase 01]: READY validates identified offline materials only; original-DxWnd/native Linux/native Windows acceptance remains open 0/120.
|
||||
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -98,6 +101,6 @@ No original-required category deferred outside full reconstruction. Later phases
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-11-13T16:07:38.134Z
|
||||
Stopped at: Quota interrupted01-05 task2; reconcile partialsource beforecontinuing
|
||||
Resume file: .planning/phases/01-reproducible-fidelity-baseline/.continue-here.md
|
||||
Last session: 2026-11-13T16:45:56.992Z
|
||||
Stopped at: Completed 01-05-PLAN.md
|
||||
Resume file: None
|
||||
@@ -49,5 +49,5 @@
|
||||
"label": "Advance to the next step",
|
||||
"reason": "Phase 1 of 8 · 0% · executing"
|
||||
},
|
||||
"updated_at": "2026-11-13T04:23:08.932Z"
|
||||
"updated_at": "2026-11-13T16:45:56.190Z"
|
||||
}
|
||||
Reference in new issue
Block a user