docs(01-05): advance verified checkpoint plan tracking
This commit is contained in:
1 parent
2d48ee5316
commit
1af5217e47
3 files changed
+15
-12
No files matched your search
+11
-8
@@ -3,16 +3,16 @@ gsd_state_version: "1.0"
|
||||
current_phase: 01
|
||||
current_phase_name: Reproducible Fidelity Baseline
|
||||
status: executing
|
||||
stopped_at: Quota interrupted01-05 task2; reconcile partialsource beforecontinuing
|
||||
last_updated: "2026-11-13T16:07:38.336Z"
|
||||
stopped_at: Completed 01-05-PLAN.md
|
||||
last_updated: "2026-11-13T16:45:57.021Z"
|
||||
last_activity: 2026-11-12
|
||||
last_activity_desc: Phase 01 execution started
|
||||
state_head: 818191c90c997618df2c31d5ba90b5fc21328d76
|
||||
state_head: 2d48ee5316a727e510db54910c59bc0a79e18e6f
|
||||
progress:
|
||||
total_phases: 8
|
||||
completed_phases: 0
|
||||
total_plans: 7
|
||||
completed_plans: 4
|
||||
completed_plans: 5
|
||||
percent: 0
|
||||
---
|
||||
|
||||
@@ -28,7 +28,7 @@ See: .planning/PROJECT.md (updated 2026-11-12)
|
||||
## Current Position
|
||||
|
||||
Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING
|
||||
Plan: 5 of 7
|
||||
Plan: 6 of 7
|
||||
Status: Ready to execute
|
||||
Last activity: 2026-11-12 — Phase 01 execution started
|
||||
|
||||
@@ -53,6 +53,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
||||
| Phase 01 P02 | 16 min | 2 tasks | 6 files |
|
||||
| Phase 01 P03 | 22 min | 2 tasks | 4 files |
|
||||
| Phase 01 P04 | 16 min | 2 tasks | 5 files |
|
||||
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -72,6 +73,8 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
||||
- [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance.
|
||||
- [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred.
|
||||
- [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations.
|
||||
- [Phase 01]: READY validates identified offline materials only; original-DxWnd/native Linux/native Windows acceptance remains open 0/120.
|
||||
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -98,6 +101,6 @@ No original-required category deferred outside full reconstruction. Later phases
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-11-13T16:07:38.134Z
|
||||
Stopped at: Quota interrupted01-05 task2; reconcile partialsource beforecontinuing
|
||||
Resume file: .planning/phases/01-reproducible-fidelity-baseline/.continue-here.md
|
||||
Last session: 2026-11-13T16:45:56.992Z
|
||||
Stopped at: Completed 01-05-PLAN.md
|
||||
Resume file: None
|
||||
Reference in new issue
Block a user