docs(01-05): advance verified checkpoint plan tracking

This commit is contained in:
UnixNight committed 2026-11-13 11:46:26 -05:00
1 parent 2d48ee5316
commit 1af5217e47
3 files changed
+15 -12

No files matched your search

+3 -3
View File
@@ -39,7 +39,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov
2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open. 2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open.
3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition. 3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition.
4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution. 4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution.
**Plans:** 4/7 plans executed **Plans:** 5/7 plans executed
**Wave 1** **Wave 1**
- [x] 01-01-PLAN.md - [x] 01-01-PLAN.md
@@ -49,7 +49,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov
- [x] 01-04-PLAN.md - [x] 01-04-PLAN.md
**Wave 3** *(blocked on Wave 2 completion)* **Wave 3** *(blocked on Wave 2 completion)*
- [ ] 01-05-PLAN.md - [x] 01-05-PLAN.md
**Wave 4** *(blocked on Wave 3 completion)* **Wave 4** *(blocked on Wave 3 completion)*
- [ ] 01-06-PLAN.md - [ ] 01-06-PLAN.md
@@ -151,7 +151,7 @@ Execution follows 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8, subject to the ex
| Phase | Plans Complete | Status | Completed | | Phase | Plans Complete | Status | Completed |
|-------|----------------|--------|-----------| |-------|----------------|--------|-----------|
| 1. Reproducible Fidelity Baseline | 4/7 | In Progress | - | | 1. Reproducible Fidelity Baseline | 5/7 | In Progress | - |
| 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - | | 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - |
| 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - | | 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - |
| 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - | | 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - |
+11 -8
View File
@@ -3,16 +3,16 @@ gsd_state_version: "1.0"
current_phase: 01 current_phase: 01
current_phase_name: Reproducible Fidelity Baseline current_phase_name: Reproducible Fidelity Baseline
status: executing status: executing
stopped_at: Quota interrupted01-05 task2; reconcile partialsource beforecontinuing stopped_at: Completed 01-05-PLAN.md
last_updated: "2026-11-13T16:07:38.336Z" last_updated: "2026-11-13T16:45:57.021Z"
last_activity: 2026-11-12 last_activity: 2026-11-12
last_activity_desc: Phase 01 execution started last_activity_desc: Phase 01 execution started
state_head: 818191c90c997618df2c31d5ba90b5fc21328d76 state_head: 2d48ee5316a727e510db54910c59bc0a79e18e6f
progress: progress:
total_phases: 8 total_phases: 8
completed_phases: 0 completed_phases: 0
total_plans: 7 total_plans: 7
completed_plans: 4 completed_plans: 5
percent: 0 percent: 0
--- ---
@@ -28,7 +28,7 @@ See: .planning/PROJECT.md (updated 2026-11-12)
## Current Position ## Current Position
Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING
Plan: 5 of 7 Plan: 6 of 7
Status: Ready to execute Status: Ready to execute
Last activity: 2026-11-12 — Phase 01 execution started Last activity: 2026-11-12 — Phase 01 execution started
@@ -53,6 +53,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
| Phase 01 P02 | 16 min | 2 tasks | 6 files | | Phase 01 P02 | 16 min | 2 tasks | 6 files |
| Phase 01 P03 | 22 min | 2 tasks | 4 files | | Phase 01 P03 | 22 min | 2 tasks | 4 files |
| Phase 01 P04 | 16 min | 2 tasks | 5 files | | Phase 01 P04 | 16 min | 2 tasks | 5 files |
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
## Accumulated Context ## Accumulated Context
@@ -72,6 +73,8 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
- [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance. - [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance.
- [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred. - [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred.
- [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations. - [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations.
- [Phase 01]: READY validates identified offline materials only; original-DxWnd/native Linux/native Windows acceptance remains open 0/120.
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
### Pending Todos ### Pending Todos
@@ -98,6 +101,6 @@ No original-required category deferred outside full reconstruction. Later phases
## Session Continuity ## Session Continuity
Last session: 2026-11-13T16:07:38.134Z Last session: 2026-11-13T16:45:56.992Z
Stopped at: Quota interrupted01-05 task2; reconcile partialsource beforecontinuing Stopped at: Completed 01-05-PLAN.md
Resume file: .planning/phases/01-reproducible-fidelity-baseline/.continue-here.md Resume file: None
+1 -1
View File
@@ -49,5 +49,5 @@
"label": "Advance to the next step", "label": "Advance to the next step",
"reason": "Phase 1 of 8 · 0% · executing" "reason": "Phase 1 of 8 · 0% · executing"
}, },
"updated_at": "2026-11-13T04:23:08.932Z" "updated_at": "2026-11-13T16:45:56.190Z"
} }