# Phase 01 — Plan Verification Receipt
|
|
|
|
**Date:** 2026-11-12
|
|
**Result:** VERIFICATION PASSED after one revision cycle; zero remaining blockers/warnings.
|
|
|
|
Independent initial checker reviewed seven plans, 15 tasks and five waves. All four
|
|
requirements and 16 context decisions are covered; dependencies are acyclic and
|
|
same-wave file ownership is disjoint. Deterministic verify-command path and stated
|
|
failure-direction probes each examined 24 commands with zero findings. New paths
|
|
are declared future artifacts, not implementation already present.
|
|
|
|
## Findings resolved
|
|
|
|
1. Research resolution blocker: five research questions now carry concrete RESOLVED
|
|
planning policies and task references. Unknown Windows/DxWnd/capture/browser
|
|
outcomes remain explicit execution acceptance dependencies.
|
|
2. Scope warning for plan 01-07: a scope_budget block bounds ten files to two
|
|
substantive implementation/test files and serial final evidence/report/runner
|
|
projections. The 30,000-token estimate is below the 100,000-token plan budget;
|
|
confidence remains low because this roadmap has no calibration samples.
|
|
|
|
A separate independent checker rechecked both changes and returned VERIFICATION
|
|
PASSED with zero blockers/warnings. No requirement or human acceptance was waived.
|
|
|
|
## Final deterministic gates
|
|
|
|
- Requirement coverage: EVID-01 through EVID-04, 4/4.
|
|
- Context decision coverage: D-01 through D-16, 16/16.
|
|
- Post-planning gap analysis: 20/20 combined items; zero uncovered.
|
|
- Seven plan structure/frontmatter validations passed during planning.
|
|
- Original inventory: 539 unchanged files verified by the prescribed command.
|
|
|
|
Planning and original inventory checks only: new implementation/test fixtures,
|
|
original/DxWnd captures and native Linux/Windows acceptance were not executed.
|
|
They remain in the execution plans; prepared materials cannot establish parity.
|