5.0 KiB
gsd_state_version, current_phase, current_phase_name, status, stopped_at, last_updated, last_activity, last_activity_desc, state_head, progress
| gsd_state_version | current_phase | current_phase_name | status | stopped_at | last_updated | last_activity | last_activity_desc | state_head | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | 01 | Reproducible Fidelity Baseline | paused | User usage pause;01-03 task2 partial; resume after10:28 PM reset | 2026-11-13T01:02:27.885Z | 2026-11-12 | Phase 01 execution started | c21ed7d7a2 |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-11-12)
Core value: Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification. Current focus: Phase 01 — Reproducible Fidelity Baseline
Current Position
Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING Plan: 3 of 7 Status: Paused Last activity: 2026-11-12 — Phase 01 execution started
Progress: [░░░░░░░░░░] 0%
Performance Metrics
- Total plans completed: 0
- Average duration: Not established
- Total execution time: 0 hours
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| - | - | - | - |
Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence. Per-Plan Metrics:
| Plan | Duration | Tasks | Files |
|---|---|---|---|
| Phase 01 P01 | 16 min | 2 tasks | 5 files |
| Phase 01 P02 | 16 min | 2 tasks | 6 files |
Accumulated Context
Decisions
- Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks.
- Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session.
- Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion.
- Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release.
- Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes.
- [Phase 01]: Version 1 typed hashed receipts keep category, history and actual bytes separate from acceptance; structural readiness never substitutes for native/reference execution.
- [Phase 01]: All eight lifetime/dialogue/input cells require continuous plus four focused obligations on three original/native sides, totaling 120 independently audited obligations.
- [Phase 01]: Retained observations require one session, observed prerequisite departure/return and hashed copy state; each fresh run uses an independent launch/session identity.
- [Phase 01]: Paired review preserves actual speed, separate raw clocks, explicit event and playback drift, exclusive audio and complete recording tails; export never promotes runtime acceptance.
- [Phase 01]: Capability source links are normalized to contained tracked bounded UTF-8 text copies and activated only through exporter-validated local hrefs.
Pending Todos
None captured separately. Next action: $gsd-discuss-phase 1 or $gsd-plan-phase 1.
Blockers/Concerns
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
- Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect.
Evidence Pointers
.planning/research/SUMMARY.md,.planning/codebase/— scope, dependencies and current architecture.docs/progress.md,docs/compatibility.md,docs/tasks.md— implementation/runtime receipts and open work.docs/checkpoint/next-work-plan.md,coverage.md,implementation-plan.md— recovery/admission sequence (latter two under the same directory).docs/gameplay/main-menu-player-lifetime.md,jimmy-movement-stabilization.md— preserved correction and movement priority (same directory).../prompt.MD,AGENTS.md,../AGENTS.md— authoritative specification/rules; original manifest atdocs/original-manifest.json.
Deferred Items
No original-required category deferred outside full reconstruction. Later phases express dependency order only.
Session Continuity
Last session: 2026-11-13T01:02:27.859Z Stopped at: User usage pause;01-03 task2 partial; resume after10:28 PM reset Resume file: .planning/phases/01-reproducible-fidelity-baseline/.continue-here.md