docs(01-07): track completed preparation and open acceptance gate
This commit is contained in:
1 parent
52a3e2d5ff
commit
215d01e43e
3 files changed
+36
-24
No files matched your search
+22
-18
@@ -2,17 +2,17 @@
|
||||
gsd_state_version: "1.0"
|
||||
current_phase: 01
|
||||
current_phase_name: Reproducible Fidelity Baseline
|
||||
status: executing
|
||||
stopped_at: Paused by15% quota guard;01-07task3 test/review pending; HANDOFF takes precedence
|
||||
last_updated: "2026-11-13T17:28:45.982275+00:00"
|
||||
last_activity: 2026-11-12
|
||||
last_activity_desc: Phase 01 execution started
|
||||
state_head: c60248dbfe5c8d151677babca0543af1f1d1b5e0
|
||||
status: ready_for_verification
|
||||
stopped_at: Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120
|
||||
last_updated: "2026-11-13T21:48:54.245Z"
|
||||
last_activity: 2026-11-13
|
||||
last_activity_desc: 01-07 autonomous preparation verified; actual human acceptance pending 0/120
|
||||
state_head: 52a3e2d5ff19a87e1bd268cdda8eb0ec6bf5e451
|
||||
progress:
|
||||
total_phases: 8
|
||||
completed_phases: 0
|
||||
total_plans: 7
|
||||
completed_plans: 6
|
||||
completed_plans: 7
|
||||
percent: 0
|
||||
---
|
||||
|
||||
@@ -27,24 +27,24 @@ See: .planning/PROJECT.md (updated 2026-11-12)
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING
|
||||
Phase: 01 (Reproducible Fidelity Baseline) — HUMAN ACCEPTANCE PENDING
|
||||
Plan: 7 of 7
|
||||
Status: Interrupted —01-07 task1 complete; task2 human_needed; task3 fullsuite active
|
||||
Last activity: 2026-11-12 — Phase 01 execution started
|
||||
Status: Ready for primary review — 7/7 autonomous preparation records; actual 01-07-02 capture/review human_needed, 0/120 accepted. Phase 1 remains open; Phase 2 not advanced.
|
||||
Last activity: 2026-11-13 — Task 3 committed, complete local suite passed in 782.05s; final summary committed.
|
||||
|
||||
Progress: [░░░░░░░░░░] 0%
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
- Total plans completed: 0
|
||||
- Average duration: Not established
|
||||
- Total execution time: 0 hours
|
||||
- Autonomous preparation plans recorded: 7/7; accepted phases: 0/8
|
||||
- Average duration: See per-plan metrics; elapsed intervals include pauses
|
||||
- Total active execution time: Not continuously measured
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| - | - | - | - |
|
||||
|
||||
Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence.
|
||||
Recent trend: All seven preparation/reconciliation records exist; actual task 01-07-02 and Phase 1/EVID acceptance remain open. Existing project work retains its documented bounded evidence.
|
||||
**Per-Plan Metrics:**
|
||||
|
||||
| Plan | Duration | Tasks | Files |
|
||||
@@ -55,6 +55,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
||||
| Phase 01 P04 | 16 min | 2 tasks | 5 files |
|
||||
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
|
||||
| Phase 01 P06 | 14 min | 2 tasks | 4 files |
|
||||
| Phase 01 P07 | 4h 36min elapsed incl quota pause; suite 782.05s | 2 tasks | 16 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -78,13 +79,16 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
||||
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
|
||||
- [Phase 01]: No display and only auto_null audio yields failed native preflight; all forty Linux obligations retain explicit physical/audible capture dependencies.
|
||||
- [Phase 01]: Linux matrix history revalidates saved receipt hashes and requires new launch/session IDs; focused captures cannot replace continuous route lifetimes.
|
||||
- [Phase 01]: Ready materials and local regressions never substitute for actual original/native acceptance; all 120 obligations and ten named human findings remain open.
|
||||
- [Phase 01]: The integration agent reconciles returned collector records through specified artifact mappings; the tester collects, observes and returns one combined session.
|
||||
|
||||
### Pending Todos
|
||||
|
||||
None captured separately. Next action: `$gsd-discuss-phase 1` or `$gsd-plan-phase 1`.
|
||||
Primary readiness review of final 01-07 source/materials, then the single combined human session in docs/evidence/checkpoint-session.md. All EVID requirements remain Pending. Do not launch Phase 2 from preparation counts.
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
- Final 01-07 readiness passes 11,000 immutable files and local suite passes; strict audit still exits 1 with no structural errors, 0/120 accepted obligations and ten pending human findings. This is an actual evidence dependency, not a test failure or auto-approval gate.
|
||||
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
|
||||
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
|
||||
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
|
||||
@@ -104,6 +108,6 @@ No original-required category deferred outside full reconstruction. Later phases
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-11-13T17:04:40.619Z
|
||||
Stopped at: Paused by15% quota guard;01-07task3 test/review pending
|
||||
Resume file: .planning/phases/01-reproducible-fidelity-baseline/HANDOFF.md
|
||||
Last session: 2026-11-13T21:48:54.215Z
|
||||
Stopped at: Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120
|
||||
Resume file: None
|
||||
Reference in new issue
Block a user