docs(01-07): track completed preparation and open acceptance gate
This commit is contained in:
1 parent
52a3e2d5ff
commit
215d01e43e
3 files changed
+36
-24
No files matched your search
+11
-3
@@ -39,7 +39,7 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov
|
|||||||
2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open.
|
2. A tester can reproduce identified whole-original reference scenarios from an isolated generated installation and inspect corresponding input/events, images and audio where applicable; unavailable execution keeps this criterion open.
|
||||||
3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition.
|
3. A reviewer can trace every full-game capability from original evidence through current implementation, platform receipts, discrepancies and its remaining acceptance condition.
|
||||||
4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution.
|
4. Testers can repeat the same baseline movement/route scenarios on native Linux and native Windows with exact revision identities; Wine/cross-publish receipts remain separately labeled and cannot close missing native execution.
|
||||||
**Plans:** 6/7 plans executed
|
**Plans:** 7/7 autonomous preparation/reconciliation plans recorded; actual 01-07-02 capture/review and Phase 1 acceptance remain pending.
|
||||||
**Wave 1**
|
**Wave 1**
|
||||||
- [x] 01-01-PLAN.md
|
- [x] 01-01-PLAN.md
|
||||||
|
|
||||||
@@ -55,7 +55,15 @@ Integer phases are planned work; decimal phases may be inserted for urgent recov
|
|||||||
- [x] 01-06-PLAN.md
|
- [x] 01-06-PLAN.md
|
||||||
|
|
||||||
**Wave 5** *(blocked on Wave 4 completion)*
|
**Wave 5** *(blocked on Wave 4 completion)*
|
||||||
- [ ] 01-07-PLAN.md
|
- [x] 01-07-PLAN.md
|
||||||
|
|
||||||
|
Autonomous preparation is complete: 11,000 immutable files pass readiness and
|
||||||
|
the complete local suite passes in 782.05s. Actual task 01-07-02 capture/review
|
||||||
|
remains human_needed: 0/120 original/native obligations accepted and ten human
|
||||||
|
findings pending. All EVID requirements remain Pending; Phase 1 is not accepted.
|
||||||
|
The primary reviews readiness before one combined session. Retained quota
|
||||||
|
handoff files are historical until primary consumption; the final SUMMARY
|
||||||
|
records completed task 3 and pending human dependencies. No Phase 2 advancement.
|
||||||
|
|
||||||
### Phase 2: Faithful Movement and Scene Handoffs
|
### Phase 2: Faithful Movement and Scene Handoffs
|
||||||
**Goal:** Players move, contact the world and return from scripts/scenes with the original movement, animation, camera and state ownership intact.
|
**Goal:** Players move, contact the world and return from scripts/scenes with the original movement, animation, camera and state ownership intact.
|
||||||
@@ -151,7 +159,7 @@ Execution follows 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8, subject to the ex
|
|||||||
|
|
||||||
| Phase | Plans Complete | Status | Completed |
|
| Phase | Plans Complete | Status | Completed |
|
||||||
|-------|----------------|--------|-----------|
|
|-------|----------------|--------|-----------|
|
||||||
| 1. Reproducible Fidelity Baseline | 6/7 | In Progress | - |
|
| 1. Reproducible Fidelity Baseline | 7/7 preparation | Human acceptance pending (0/120) | - |
|
||||||
| 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - |
|
| 2. Faithful Movement and Scene Handoffs | 0/TBD | Not started | - |
|
||||||
| 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - |
|
| 3. Original Actors, Hazards and Combat | 0/TBD | Not started | - |
|
||||||
| 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - |
|
| 4. Complete Gadget and Vehicle Use | 0/TBD | Not started | - |
|
||||||
|
|||||||
+22
-18
@@ -2,17 +2,17 @@
|
|||||||
gsd_state_version: "1.0"
|
gsd_state_version: "1.0"
|
||||||
current_phase: 01
|
current_phase: 01
|
||||||
current_phase_name: Reproducible Fidelity Baseline
|
current_phase_name: Reproducible Fidelity Baseline
|
||||||
status: executing
|
status: ready_for_verification
|
||||||
stopped_at: Paused by15% quota guard;01-07task3 test/review pending; HANDOFF takes precedence
|
stopped_at: Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120
|
||||||
last_updated: "2026-11-13T17:28:45.982275+00:00"
|
last_updated: "2026-11-13T21:48:54.245Z"
|
||||||
last_activity: 2026-11-12
|
last_activity: 2026-11-13
|
||||||
last_activity_desc: Phase 01 execution started
|
last_activity_desc: 01-07 autonomous preparation verified; actual human acceptance pending 0/120
|
||||||
state_head: c60248dbfe5c8d151677babca0543af1f1d1b5e0
|
state_head: 52a3e2d5ff19a87e1bd268cdda8eb0ec6bf5e451
|
||||||
progress:
|
progress:
|
||||||
total_phases: 8
|
total_phases: 8
|
||||||
completed_phases: 0
|
completed_phases: 0
|
||||||
total_plans: 7
|
total_plans: 7
|
||||||
completed_plans: 6
|
completed_plans: 7
|
||||||
percent: 0
|
percent: 0
|
||||||
---
|
---
|
||||||
|
|
||||||
@@ -27,24 +27,24 @@ See: .planning/PROJECT.md (updated 2026-11-12)
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING
|
Phase: 01 (Reproducible Fidelity Baseline) — HUMAN ACCEPTANCE PENDING
|
||||||
Plan: 7 of 7
|
Plan: 7 of 7
|
||||||
Status: Interrupted —01-07 task1 complete; task2 human_needed; task3 fullsuite active
|
Status: Ready for primary review — 7/7 autonomous preparation records; actual 01-07-02 capture/review human_needed, 0/120 accepted. Phase 1 remains open; Phase 2 not advanced.
|
||||||
Last activity: 2026-11-12 — Phase 01 execution started
|
Last activity: 2026-11-13 — Task 3 committed, complete local suite passed in 782.05s; final summary committed.
|
||||||
|
|
||||||
Progress: [░░░░░░░░░░] 0%
|
Progress: [░░░░░░░░░░] 0%
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
- Total plans completed: 0
|
- Autonomous preparation plans recorded: 7/7; accepted phases: 0/8
|
||||||
- Average duration: Not established
|
- Average duration: See per-plan metrics; elapsed intervals include pauses
|
||||||
- Total execution time: 0 hours
|
- Total active execution time: Not continuously measured
|
||||||
|
|
||||||
| Phase | Plans | Total | Avg/Plan |
|
| Phase | Plans | Total | Avg/Plan |
|
||||||
|-------|-------|-------|----------|
|
|-------|-------|-------|----------|
|
||||||
| - | - | - | - |
|
| - | - | - | - |
|
||||||
|
|
||||||
Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence.
|
Recent trend: All seven preparation/reconciliation records exist; actual task 01-07-02 and Phase 1/EVID acceptance remain open. Existing project work retains its documented bounded evidence.
|
||||||
**Per-Plan Metrics:**
|
**Per-Plan Metrics:**
|
||||||
|
|
||||||
| Plan | Duration | Tasks | Files |
|
| Plan | Duration | Tasks | Files |
|
||||||
@@ -55,6 +55,7 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
|||||||
| Phase 01 P04 | 16 min | 2 tasks | 5 files |
|
| Phase 01 P04 | 16 min | 2 tasks | 5 files |
|
||||||
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
|
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
|
||||||
| Phase 01 P06 | 14 min | 2 tasks | 4 files |
|
| Phase 01 P06 | 14 min | 2 tasks | 4 files |
|
||||||
|
| Phase 01 P07 | 4h 36min elapsed incl quota pause; suite 782.05s | 2 tasks | 16 files |
|
||||||
|
|
||||||
## Accumulated Context
|
## Accumulated Context
|
||||||
|
|
||||||
@@ -78,13 +79,16 @@ Recent trend: No execution plans completed in this roadmap. Existing project wor
|
|||||||
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
|
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
|
||||||
- [Phase 01]: No display and only auto_null audio yields failed native preflight; all forty Linux obligations retain explicit physical/audible capture dependencies.
|
- [Phase 01]: No display and only auto_null audio yields failed native preflight; all forty Linux obligations retain explicit physical/audible capture dependencies.
|
||||||
- [Phase 01]: Linux matrix history revalidates saved receipt hashes and requires new launch/session IDs; focused captures cannot replace continuous route lifetimes.
|
- [Phase 01]: Linux matrix history revalidates saved receipt hashes and requires new launch/session IDs; focused captures cannot replace continuous route lifetimes.
|
||||||
|
- [Phase 01]: Ready materials and local regressions never substitute for actual original/native acceptance; all 120 obligations and ten named human findings remain open.
|
||||||
|
- [Phase 01]: The integration agent reconciles returned collector records through specified artifact mappings; the tester collects, observes and returns one combined session.
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
None captured separately. Next action: `$gsd-discuss-phase 1` or `$gsd-plan-phase 1`.
|
Primary readiness review of final 01-07 source/materials, then the single combined human session in docs/evidence/checkpoint-session.md. All EVID requirements remain Pending. Do not launch Phase 2 from preparation counts.
|
||||||
|
|
||||||
### Blockers/Concerns
|
### Blockers/Concerns
|
||||||
|
|
||||||
|
- Final 01-07 readiness passes 11,000 immutable files and local suite passes; strict audit still exits 1 with no structural errors, 0/120 accepted obligations and ten pending human findings. This is an actual evidence dependency, not a test failure or auto-approval gate.
|
||||||
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
|
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
|
||||||
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
|
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
|
||||||
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
|
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
|
||||||
@@ -104,6 +108,6 @@ No original-required category deferred outside full reconstruction. Later phases
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-11-13T17:04:40.619Z
|
Last session: 2026-11-13T21:48:54.215Z
|
||||||
Stopped at: Paused by15% quota guard;01-07task3 test/review pending
|
Stopped at: Completed 01-07 autonomous preparation; primary readiness review then one combined human session; acceptance OPEN 0/120
|
||||||
Resume file: .planning/phases/01-reproducible-fidelity-baseline/HANDOFF.md
|
Resume file: None
|
||||||
@@ -46,8 +46,8 @@
|
|||||||
],
|
],
|
||||||
"next": {
|
"next": {
|
||||||
"command": "$gsd-progress --next",
|
"command": "$gsd-progress --next",
|
||||||
"label": "Advance to the next step",
|
"label": "Review prepared Phase 1 checkpoint and pending combined human session",
|
||||||
"reason": "Phase 1 of 8 · 0% · executing"
|
"reason": "Phase 1 remains open: 7/7 autonomous preparation records, actual acceptance human_needed 0/120; Phase 2 not advanced"
|
||||||
},
|
},
|
||||||
"updated_at": "2026-11-13T17:04:38.735Z"
|
"updated_at": "2026-11-13T21:49:00Z"
|
||||||
}
|
}
|
||||||