gsd_state_version: "1.0"
|
|
current_phase: 01
|
|
current_phase_name: Reproducible Fidelity Baseline
|
|
status: executing
|
|
stopped_at: Completed 01-05-PLAN.md
|
|
last_updated: "2026-11-13T16:45:57.021Z"
|
|
last_activity: 2026-11-12
|
|
last_activity_desc: Phase 01 execution started
|
|
state_head: 2d48ee5316a727e510db54910c59bc0a79e18e6f
|
|
progress:
|
|
total_phases: 8
|
|
completed_phases: 0
|
|
total_plans: 7
|
|
completed_plans: 5
|
|
percent: 0
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-11-12)
|
|
|
|
**Core value:** Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification.
|
|
**Current focus:** Phase 01 — Reproducible Fidelity Baseline
|
|
|
|
## Current Position
|
|
|
|
Phase: 01 (Reproducible Fidelity Baseline) — EXECUTING
|
|
Plan: 6 of 7
|
|
Status: Ready to execute
|
|
Last activity: 2026-11-12 — Phase 01 execution started
|
|
|
|
Progress: [░░░░░░░░░░] 0%
|
|
|
|
## Performance Metrics
|
|
|
|
- Total plans completed: 0
|
|
- Average duration: Not established
|
|
- Total execution time: 0 hours
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| - | - | - | - |
|
|
|
|
Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence.
|
|
**Per-Plan Metrics:**
|
|
|
|
| Plan | Duration | Tasks | Files |
|
|
|------|----------|-------|-------|
|
|
| Phase 01 P01 | 16 min | 2 tasks | 5 files |
|
|
| Phase 01 P02 | 16 min | 2 tasks | 6 files |
|
|
| Phase 01 P03 | 22 min | 2 tasks | 4 files |
|
|
| Phase 01 P04 | 16 min | 2 tasks | 5 files |
|
|
| Phase 01 P05 | 12h 4min | 2 tasks | 7 files |
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
- Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks.
|
|
- Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session.
|
|
- Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion.
|
|
- Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release.
|
|
- Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes.
|
|
- [Phase 01]: Version 1 typed hashed receipts keep category, history and actual bytes separate from acceptance; structural readiness never substitutes for native/reference execution.
|
|
- [Phase 01]: All eight lifetime/dialogue/input cells require continuous plus four focused obligations on three original/native sides, totaling 120 independently audited obligations.
|
|
- [Phase 01]: Retained observations require one session, observed prerequisite departure/return and hashed copy state; each fresh run uses an independent launch/session identity.
|
|
- [Phase 01]: Paired review preserves actual speed, separate raw clocks, explicit event and playback drift, exclusive audio and complete recording tails; export never promotes runtime acceptance.
|
|
- [Phase 01]: Capability source links are normalized to contained tracked bounded UTF-8 text copies and activated only through exporter-validated local hrefs.
|
|
- [Phase 01]: Capability ledger maps all33 requirements and reconciles33 hashed checkpoint rows; documentary coverage, unimplemented work and exact historical content never promote actual original/native acceptance.
|
|
- [Phase 01]: One outer observer owns a unique launch/clock identity through Run continuations; simulation ticks remain scene-local and case/session IDs remain declared provenance.
|
|
- [Phase 01]: Accepted input means the existing binding's returned gate result, with separately identified post-step ownership; individual command dispatch and independent body/fire work are not inferred.
|
|
- [Phase 01]: Observer records are diagnostic source material for later collectors, not receipts or automatic original/native acceptance; fixture classification survives continuations.
|
|
- [Phase 01]: READY validates identified offline materials only; original-DxWnd/native Linux/native Windows acceptance remains open 0/120.
|
|
- [Phase 01]: Runtime package provenance retains actual completed publish source/dirty/diff identity; selected external tools are identified without redistributing executables.
|
|
|
|
### Pending Todos
|
|
|
|
None captured separately. Next action: `$gsd-discuss-phase 1` or `$gsd-plan-phase 1`.
|
|
|
|
### Blockers/Concerns
|
|
|
|
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
|
|
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
|
|
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
|
|
- Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect.
|
|
|
|
### Evidence Pointers
|
|
|
|
- `.planning/research/SUMMARY.md`, `.planning/codebase/` — scope, dependencies and current architecture.
|
|
- `docs/progress.md`, `docs/compatibility.md`, `docs/tasks.md` — implementation/runtime receipts and open work.
|
|
- `docs/checkpoint/next-work-plan.md`, `coverage.md`, `implementation-plan.md` — recovery/admission sequence (latter two under the same directory).
|
|
- `docs/gameplay/main-menu-player-lifetime.md`, `jimmy-movement-stabilization.md` — preserved correction and movement priority (same directory).
|
|
- `../prompt.MD`, `AGENTS.md`, `../AGENTS.md` — authoritative specification/rules; original manifest at `docs/original-manifest.json`.
|
|
|
|
## Deferred Items
|
|
|
|
No original-required category deferred outside full reconstruction. Later phases express dependency order only.
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-11-13T16:45:56.992Z
|
|
Stopped at: Completed 01-05-PLAN.md
|
|
Resume file: None
|