Files
Neutron/.planning/STATE.md
T

3.7 KiB

gsd_state_version, status, progress
gsd_state_version status progress
1.0 planning
total_phases completed_phases total_plans completed_plans percent
8 0 0 0 0

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-11-12)

Core value: Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification. Current focus: Phase 1 — Reproducible Fidelity Baseline.

Current Position

Phase: 1 of 8 (Reproducible Fidelity Baseline) Plan: None yet; phase plan count TBD Status: Ready to plan Last activity: 2026-11-12 — Initialized full-reconstruction roadmap with 33 requirements mapped once.

Progress: [░░░░░░░░░░] 0%

Performance Metrics

  • Total plans completed: 0
  • Average duration: Not established
  • Total execution time: 0 hours
Phase Plans Total Avg/Plan
- - - -

Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence.

Accumulated Context

Decisions

  • Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks.
  • Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session.
  • Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion.
  • Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release.
  • Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes.

Pending Todos

None captured separately. Next action: $gsd-discuss-phase 1 or $gsd-plan-phase 1.

Blockers/Concerns

  • Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
  • Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
  • Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
  • Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect.

Evidence Pointers

  • .planning/research/SUMMARY.md, .planning/codebase/ — scope, dependencies and current architecture.
  • docs/progress.md, docs/compatibility.md, docs/tasks.md — implementation/runtime receipts and open work.
  • docs/checkpoint/next-work-plan.md, coverage.md, implementation-plan.md — recovery/admission sequence (latter two under the same directory).
  • docs/gameplay/main-menu-player-lifetime.md, jimmy-movement-stabilization.md — preserved correction and movement priority (same directory).
  • ../prompt.MD, AGENTS.md, ../AGENTS.md — authoritative specification/rules; original manifest at docs/original-manifest.json.

Deferred Items

No original-required category deferred outside full reconstruction. Later phases express dependency order only.

Session Continuity

Last session: 2026-11-12 Stopped at: Roadmap initialization; Phase 1 ready for planning, 0 phases completed. Resume file: None