Files
Neutron/.planning/STATE.md
T

80 lines
3.7 KiB
Markdown

---
gsd_state_version: '1.0'
status: planning
progress:
total_phases: 8
completed_phases: 0
total_plans: 0
completed_plans: 0
percent: 0
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-11-12)
**Core value:** Match original behavior and presentation as accurately as possible, governed by authoritative evidence and explicit verification.
**Current focus:** Phase 1 — Reproducible Fidelity Baseline.
## Current Position
Phase: 1 of 8 (Reproducible Fidelity Baseline)
Plan: None yet; phase plan count TBD
Status: Ready to plan
Last activity: 2026-11-12 — Initialized full-reconstruction roadmap with 33 requirements mapped once.
Progress: [░░░░░░░░░░] 0%
## Performance Metrics
- Total plans completed: 0
- Average duration: Not established
- Total execution time: 0 hours
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| - | - | - | - |
Recent trend: No execution plans completed in this roadmap. Existing project work predates initialization and retains its documented bounded evidence.
## Accumulated Context
### Decisions
- Full remaining original game is in scope; fidelity governs behavior and presentation, including significant original quirks.
- Playable slices, standard granularity, autonomous mode and parallel independent plans; research, plan checking and verification enabled; models inherit this session.
- Preserve Jimmy movement and implemented TSK startup-order correction; movement/contact/helper/animation/camera stabilization precedes broader gameplay expansion.
- Cross-cutting checks continue throughout; each requirement has one accountable phase. No original-required category is deferred outside this release.
- Builds/tests/packages stay local; push verified source/tools/docs to existing Gitea. Preserve unrelated working-tree changes.
### Pending Todos
None captured separately. Next action: `$gsd-discuss-phase 1` or `$gsd-plan-phase 1`.
### Blockers/Concerns
- Phase 1: Working whole-original reference capture and current native Windows comparison remain unverified access dependencies. Record limitations; keep acceptance open while independent source-backed recovery continues.
- Phase 2: Real derived responses, helper membership/activation/cleanup, physical order and shared mutable reclip remain live admission gates. Lab/outside capsule stays until its replacement gate closes.
- Full-game completion requires current integrated native Linux/Windows and original-reference evidence. Compilation, copied-original probes and Wine have narrower scopes.
- Historical reports contain superseded narratives; prefer later continuation receipts with exact revision/platform identity. Carl startup ordering is already corrected, not an untouched defect.
### Evidence Pointers
- `.planning/research/SUMMARY.md`, `.planning/codebase/` — scope, dependencies and current architecture.
- `docs/progress.md`, `docs/compatibility.md`, `docs/tasks.md` — implementation/runtime receipts and open work.
- `docs/checkpoint/next-work-plan.md`, `coverage.md`, `implementation-plan.md` — recovery/admission sequence (latter two under the same directory).
- `docs/gameplay/main-menu-player-lifetime.md`, `jimmy-movement-stabilization.md` — preserved correction and movement priority (same directory).
- `../prompt.MD`, `AGENTS.md`, `../AGENTS.md` — authoritative specification/rules; original manifest at `docs/original-manifest.json`.
## Deferred Items
No original-required category deferred outside full reconstruction. Later phases express dependency order only.
## Session Continuity
Last session: 2026-11-12
Stopped at: Roadmap initialization; Phase 1 ready for planning, 0 phases completed.
Resume file: None